Skip to content

Search is only available in production builds. Try building and previewing the site to test it out locally.

Ground (terminal 31) at 654 (On right D-pillar)

Net nfed7eb80 · one diagram

Function
Ground (terminal 31) at 654 (On right D-pillar)stated
Basis: ground connection 219; these splices are drawn bonded to body ground point 654 elsewhere in the manual
Also named
Ground (terminal 31)
Wire
brsw
Models
B7 only · Avant only
Drawn in
1 diagram, 4 stretches
Checked
Not checked by hand. Extracted from the manual automatically.

What is on this wire

Parts (1)

  • Z1pin ?Heated rear window

Grounds (1)

  • 219Ground connection -2-, in rear lid wiring harness

Where these parts are

PartLocation
Z1Rear windowinferred from name
219Splice inside the rear lid wiring harnesssheet legend

Drawing

Wires are br (brown) unless a colour is written on them. 4 parts and points, 4 connections.

A schematic of the connections, drawn by this site from the traced wire: not the layout of the sheets. Red-edged boxes are the supply side. Parts appear once with every pin this wire touches; splices, grounds and inline connectors once per diagram (their codes repeat between diagrams). A wire that continues through a reference box or an unnamed joint is one line. Not shown: what is inside the parts (fuse elements, relay contacts, switches). Dashed lines are uncertain links; dashed red boxes are ends the extraction could not resolve. Tap a line for its stretch below, its colour for the sheet.

Stretch by stretch

Every stretch of this wire as the sheets draw it: one block per diagram, one table per sheet. The track number opens the stretch on the drawn sheet.

53 · Avant, rear wiring B7 · Avant · 4 stretches

Diagram 53 page

Page 398manual · Rear Window Breakages Sensors, Heated Rear Window

TrackWireFromToNotes
46br 4.0 mm²Z1 pinground 219
48br 4.0 mm²jointground 219
48sw 4.0 mm²Z1 pinjoint
50sw 1.5 mm²jointjoint

From the factory manual Audi A4 Wiring Diagrams and Component Locations, edition 12.2005, extracted automatically. Check anything important against the PDF sheet.